SEAX-1 Segment 1 Mersing PLSE Cable Landing October 10th, 2017
Optic Marine Services’ Cable Installation Barge ‘Cable Orchestra’
‘Dragon Sledge’ plough share depth calibration
Barge cable tank with 7.2 kms Segment 1 Mersing shore end cable
Messenger rope with cable end about to enter LCE
Cable end entering plough bell mouth
Messenger rope overboard commencing shore pull. HDD exit buoys and landing site can be seen in background.
Cable end with buoys for floating cable ashore during pull
Recovering cable buoys as cable is sunk to the seabed
Launching the plough